East Arm Port Stabilisation

Equipment used ABI 14/18 Piling Rig, fitted with ABI MRZV 24VV Vibro hammer

  • Muller MS7 Vibro
  • STU 1800 Sheetpile
  • Macalloy tie bars and fittings

ThyssenKrupp Steelcom provided installation equipment and sheetpile to the Barclay Mowlem Thiess Joint Venture for rectification works on the Port loading/unloading facility located at East Arm Darwin NT.

The project included 335 x sheets of STU 1800 sheetpile at lengths of 6m & 8m @ a weight of 207 tonnes.

Installation was carried out by utilising TK-Steelcom’s ABI 14/18 Piling Rig and Muller MS7 Vibro EMV.