Stokes Hill Wharf Fender Piles

Muller MS32 HFV Crane suspended vibro and  BSP CX110 Impact hammer

ThyssenKrupp Steelcom supplied both our Muller MS32HFV vibro and BSP CX110 impact hammer to Advance Civil and Engineering to install 22 x 32m long fender piles on their Stokes Hill Wharf upgrade.

The piles were set with the vibro and back driven with the impact hammer to a depth of 6m into the sea bed.